Stage 2: Council approval process for a low maintenance landscape design in Wellington

Good WinnerSilver WinnerBronze Winner

The last time we visited the couple in Wellington, they were designing and planning their low-maintenance garden of their dreams. Now we look at the approval process of achieving council consent for the go ahead.

Before After
No items found.

Read more on this outdoor lanscaping project in our Stage 1 article.

Wellington Zones landscaping specialist Steve Strawbridge calls it a “positive holding pattern”.

He’s referring to the 650sqm Silverstream section he and his wife Rochelle are landscaping for clients who bought the property in September 2015.  

“What they want is a low-maintenance design that incorporates lots of seating areas. The plan includes a pergola and lots of strategic planting to create separation of the different areas of the section."
- Steve, landscaping specialist

Council consent for an outdoor room

“We’ve been through the council process and now we’re just waiting for the weather to improve so we can start the construction and planting,” he says.

The last time we spoke to Steve, he was about to submit plans to the Upper Hutt City Council. His vision for the site was to create an outdoor room, which the owners could utilise year-round.

Having moved from a damp, hilly section in Khandallah, the owners wanted to make the most of their flat, sun-drenched garden.

“What they want is a low-maintenance design that incorporates lots of seating areas. The plan includes a pergola and lots of strategic planting to create separation of the different areas of the section.”

Top view of concept designs for future landscape

Building a timber pergola

The key to Steve’s design is a timber-framed pergola, who polycarbonate roof slants 400mm, to ensure it doesn’t intrude on the environment.

“We filled out an Assessment of Environmental Impacts (AEM), which ensure that it doesn’t have a visual, environmental or community impact. As the pergola can only be seen 40cm above the fence-line, the Council was happy with it.”

Same goes for the plan to construct it one metre from the west boundary.

“Everything has gone without a hitch. In fact, the only thing the clients asked us to change, was to reduce the number of fruit trees on the northern boundary from five to three, to allow them space for a worm farm and rain housing system.”

“Once the hard structures are in, we can confirm the types of trees and shrubs to ensure we’ve got the right balance of colour and foliage, and that they’re in the right place for sun and shade."

Planting plans

Work is slated to begin in mid-August, which should mean drier conditions.

“The clay soil in Silverstream can be pretty messy in winter, so the owners wanted to wait until August when, hopefully, the builders and concrete guys won’t trail mud everywhere.”

It’s also when Steve’s horticulturalist, Katie Bailey, will put her detailed planting schedule into action.

“Once the hard structures are in, we can confirm the types of trees and shrubs to ensure we’ve got the right balance of colour and foliage, and that they’re in the right place for sun and shade. It’s also when we’ll start building up the planter boxes.”

Read more on this outdoor lanscaping project in our Stage 1 article.

 

*All information is believed to be true at time of publishing and is subject to change.
No items found.
This project was completed in
July 2016
.
No items found.
Project description
Location
Wellington
New Zealand
Client
Project duration
Cost estimate
Actual cost
Challenges
Interesting aspects
Share to

Actual costs vary by project. Plan ahead to reduce the impact of industry changes or disruptions. For more information see here.

Are you ready to discuss your ideas?

Please fill out your details in the online form provided and we’ll get back to you within 48 hours to arrange a free, no obligation consultation.

Get in touch
No items found.